TAP156027

Substation

Kentucky · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP156027 is an electric transmission substation in Kentucky, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.7512, -86.1935

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8040161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE1.4 mi
#8535161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi
#32965161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE2.4 mi
#62563161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE11.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP156027, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP156027 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GALLATINSubstation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.9
EAST GALLATINSubstation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.6
TAP155553Substation-AdjacentKYSimpson County161 kV100 MW3.7 yrs72.2
CLINTONSubstation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.0
UNKNOWN170594Substation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.0
WEST GALLATINSubstation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.0
UNKNOWN170593Substation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.0
PORTLANDSubstation-AdjacentTNSumner County161 kV100 MW3.7 yrs72.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP156027 substation, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.