TAP155534

Substation

Kentucky · KENTUCKY UTILITIES CO

Max voltage
138
kV

TAP155534 is an electric transmission substation in Kentucky, operated by KENTUCKY UTILITIES CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorKENTUCKY UTILITIES CO
Coordinates37.7914, -84.7168

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1617138 kVKENTUCKY UTILITIES COIN SERVICE0.1 mi
#10202138 kVKENTUCKY UTILITIES COIN SERVICE0.4 mi
#33223138 kVKENTUCKY UTILITIES COIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155534, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155534 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP140103Substation-AdjacentKYWoodford County345 kV600 MW3.6 yrs73.4
UNKNOWN129961Substation-AdjacentKYFayette County345 kV600 MW3.6 yrs73.2
BROWN PLANTSubstation-AdjacentKYJessamine County345 kV600 MW3.6 yrs73.0
UNKNOWN129047Substation-AdjacentKYFranklin County345 kV600 MW3.0 yrs71.6
UNKNOWN130246Substation-AdjacentKYFayette County138 kV100 MW3.6 yrs71.3
UNKNOWN129960Substation-AdjacentKYFayette County138 kV100 MW3.6 yrs71.2
UNKNOWN130278Substation-AdjacentKYFayette County138 kV100 MW3.6 yrs70.8
HAEFLINGSubstation-AdjacentKYFayette County138 kV100 MW3.6 yrs70.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155534 substation, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.