TAP154580

Substation

Kentucky · APPALACHIAN POWER CO

Max voltage
138
kV

TAP154580 is an electric transmission substation in Kentucky, operated by APPALACHIAN POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAPPALACHIAN POWER CO
Coordinates37.1894, -82.0274

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16290138 kVAPPALACHIAN POWER COIN SERVICE0.4 mi
#22790138 kVAPPALACHIAN POWER COIN SERVICE2.2 mi
#43279138 kVAPPALACHIAN POWER COIN SERVICE5.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154580, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154580 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP152242Substation-AdjacentVARussell County138 kV100 MW3.7 yrs70.8
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVASmyth County500 kV1,000 MW3.7 yrs70.0
Greenfield (BAKER - BROADFORD (765 KV))GreenfieldVADickenson County765 kV1,000 MW3.6 yrs69.0
Greenfield (BAKER - BROADFORD (765 KV))GreenfieldVARussell County765 kV1,000 MW3.6 yrs69.0
Clinch RiverBrownfieldVARussell238 MW68.9
Greenfield (BAKER - BROADFORD (765 KV))GreenfieldVADickenson County765 kV1,000 MW3.6 yrs68.1
KEAN MTN AND GRASSY CREEKSubstation-AdjacentVABuchanan County138 kV100 MW3.0 yrs67.7
SHACK MILLS STATIONSubstation-AdjacentVABuchanan County138 kV100 MW3.0 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154580 substation, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.