TAP152108 is an electric transmission substation in Kentucky, operated by KENTUCKY POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorKENTUCKY POWER CO
Coordinates37.4206, -82.9098

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5465138 kVKENTUCKY POWER COIN SERVICE1.0 mi
#8603138 kVKENTUCKY POWER COIN SERVICE5.4 mi
#48385138 kVKENTUCKY POWER COIN SERVICE9.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152108, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152108 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CONSOLIDATED COALSubstation-AdjacentKYKnott County138 kV100 MW3.6 yrs70.5
Greenfield (BAKER - BROADFORD (765 KV))GreenfieldKYPike County765 kV1,000 MW3.6 yrs69.9
Greenfield (BAKER - BROADFORD (765 KV))GreenfieldKYJohnson County765 kV1,000 MW3.6 yrs68.8
UNKNOWN121741Substation-AdjacentKYLetcher County138 kV100 MW3.6 yrs66.3
DORTONSubstation-AdjacentKYLetcher County138 kV100 MW3.6 yrs66.3
TOPMOSTSubstation-AdjacentKYKnott County138 kV100 MW3.6 yrs65.9
UNKNOWN121742Substation-AdjacentKYLetcher County138 kV100 MW3.6 yrs65.7
CEDAR CREEKSubstation-AdjacentKYPike County138 kV100 MW3.6 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152108 substation, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.