MUD FORK
SubstationKentucky · APPALACHIAN POWER CO
MUD FORK is an electric transmission substation in Kentucky, operated by APPALACHIAN POWER CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #7000 | 138 kV | APPALACHIAN POWER CO | IN SERVICE | 2.3 mi |
| #19097 | 138 kV | APPALACHIAN POWER CO | IN SERVICE | 16.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MUD FORK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WYOMING | Substation-Adjacent | WV | Wyoming County | 765 kV | 1,000 MW | 3.0 yrs | 70.8 |
| Greenfield (CULLODEN - WYOMING) | Greenfield | WV | Lincoln County | 765 kV | 1,000 MW | 3.2 yrs | 68.5 |
| UNKNOWN108954 | Substation-Adjacent | WV | Lincoln County | 138 kV | 100 MW | 3.0 yrs | 67.6 |
| Greenfield (CULLODEN - WYOMING) | Greenfield | WV | Boone County | 765 kV | 1,000 MW | 3.2 yrs | 67.1 |
| TAP154995 | Substation-Adjacent | WV | Boone County | 138 kV | 100 MW | 3.0 yrs | 66.1 |
| Greenfield (CULLODEN - WYOMING) | Greenfield | WV | Logan County | 765 kV | 1,000 MW | 3.2 yrs | 65.0 |
| MUD FORK | Substation-Adjacent | WV | Logan County | 138 kV | 100 MW | 3.6 yrs | 64.8 |
| PAD FORK | Substation-Adjacent | WV | McDowell County | 138 kV | 100 MW | 3.0 yrs | 64.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MUD FORK substation, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.