CLINCH RIVER

Substation

Kentucky · APPALACHIAN POWER CO

Max voltage
138
kV

CLINCH RIVER is an electric transmission substation in Kentucky, operated by APPALACHIAN POWER CO. It is classified as sub-transmission (138 kv) and connects 12 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines12

Ownership & operation

OperatorAPPALACHIAN POWER CO
Coordinates36.9171, -82.2440

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#419138 kVAPPALACHIAN POWER COIN SERVICE7.4 mi
#16314138 kVAPPALACHIAN POWER COIN SERVICE8.8 mi
#19844138 kVAPPALACHIAN POWER COIN SERVICE18.0 mi
#20609138 kVAPPALACHIAN POWER COIN SERVICE17.9 mi
#21411138 kVAPPALACHIAN POWER COIN SERVICE9.3 mi
#23389138 kVAPPALACHIAN POWER COIN SERVICE3.6 mi
#25714138 kVAPPALACHIAN POWER CO0.2 mi
#27440138 kVAPPALACHIAN POWER COIN SERVICE25.3 mi
#33461138 kVAPPALACHIAN POWER COIN SERVICE7.3 mi
#38841138 kVAPPALACHIAN POWER COIN SERVICE28.8 mi
#42606138 kVAPPALACHIAN POWER COIN SERVICE9.3 mi
#49484138 kVAPPALACHIAN POWER COIN SERVICE5.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLINCH RIVER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLINCH RIVER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NAGELSubstation-AdjacentVAScott County500 kV1,000 MW3.7 yrs78.2
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVAWashington County500 kV1,000 MW3.7 yrs73.3
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVABristol city500 kV1,000 MW3.7 yrs72.2
HILLSubstation-AdjacentVAScott County138 kV100 MW3.7 yrs71.9
UNKNOWN156532Substation-AdjacentVAWashington County138 kV100 MW3.7 yrs71.9
UNKNOWN115300Substation-AdjacentVAScott County138 kV100 MW3.7 yrs71.6
Greenfield (SULLIVAN - BROADFORD (765 KV))GreenfieldVABristol city500 kV1,000 MW3.7 yrs70.8
TAP152242Substation-AdjacentVARussell County138 kV100 MW3.7 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLINCH RIVER substation, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.