ARNOLD

Substation

Kentucky · KENTUCKY UTILITIES CO

Max voltage
161
kV

ARNOLD is an electric transmission substation in Kentucky, operated by KENTUCKY UTILITIES CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorKENTUCKY UTILITIES CO
Coordinates36.9281, -83.0878

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2987161 kVIN SERVICE22.0 mi
#16418161 kVKENTUCKY UTILITIES COIN SERVICE22.8 mi
#23120161 kVKENTUCKY UTILITIES COIN SERVICE20.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ARNOLD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ARNOLD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POCKET NORTHSubstation-AdjacentVALee County500 kV1,000 MW3.7 yrs78.9
Greenfield (PHILLIPS BEND - NAGEL)GreenfieldVAScott County500 kV1,000 MW3.7 yrs73.9
POCKET NORTHSubstation-AdjacentKYHarlan County500 kV1,000 MW3.6 yrs71.1
Greenfield (PHILLIPS BEND - POCKET NORTH)GreenfieldTNHawkins County500 kV1,000 MW3.7 yrs68.1
Greenfield (PHILLIPS BEND - POCKET NORTH)GreenfieldVALee County500 kV1,000 MW3.7 yrs67.7
Greenfield (PHILLIPS BEND - POCKET NORTH)GreenfieldTNHawkins County500 kV1,000 MW3.7 yrs66.7
Greenfield (POCKET NORTH - PINEVILLE)GreenfieldVALee County500 kV1,000 MW3.6 yrs66.7
Greenfield (POCKET NORTH - PINEVILLE)GreenfieldKYHarlan County500 kV1,000 MW3.6 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ARNOLD substation, Kentucky. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.