TAP140577 is an electric transmission substation in Kansas, operated by MIDWEST ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMIDWEST ENERGY INC
StateKansas
Coordinates38.6400, -101.7491

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21738115 kVMIDWEST ENERGY INCIN SERVICE19.7 mi
#24288115 kVMIDWEST ENERGY INCIN SERVICE6.0 mi
#26003115 kVMIDWEST ENERGY INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140577, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140577 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN173206Substation-AdjacentKSWallace County115 kV100 MW3.5 yrs61.5
UNKNOWN118142Substation-AdjacentKSWallace County115 kV100 MW3.5 yrs61.1
UNKNOWN119578Substation-AdjacentKSWichita County115 kV100 MW3.5 yrs61.0
UNKNOWN157111Substation-AdjacentKSGreeley County115 kV100 MW3.5 yrs60.4
UNKNOWN119520Substation-AdjacentKSGreeley County115 kV100 MW3.5 yrs60.0
UNKNOWN119519Substation-AdjacentKSGreeley County115 kV100 MW3.5 yrs58.8
TAP140577Substation-AdjacentKSGreeley County115 kV100 MW3.5 yrs58.8
TAP155832Substation-AdjacentKSGreeley County115 kV100 MW3.5 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP140577 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.