TAP138775

Substation

Kansas · WESTAR ENERGY INC

Max voltage
115
kV

TAP138775 is an electric transmission substation in Kansas, operated by WESTAR ENERGY INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWESTAR ENERGY INC
StateKansas
Coordinates39.7193, -96.9895

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3881115 kVWESTAR ENERGY INCIN SERVICE14.4 mi
#29152115 kVWESTAR ENERGY INCIN SERVICE0.0 mi
#52831115 kVWESTAR ENERGY INCIN SERVICE23.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138775, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138775 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN118212Substation-AdjacentKSClay County230 kV300 MW3.5 yrs67.1
UNKNOWN157114Substation-AdjacentKSClay County230 kV300 MW3.5 yrs65.4
UNKNOWN119676Substation-AdjacentKSWashington County115 kV100 MW3.5 yrs63.8
UNKNOWN119982Substation-AdjacentKSClay County115 kV100 MW3.5 yrs62.9
Greenfield (UNKNOWN118212 - UNKNOWN157114)GreenfieldKSClay County230 kV300 MW3.5 yrs62.9
CLIFTONSubstation-AdjacentKSWashington County115 kV100 MW3.5 yrs62.4
UNKNOWN119981Substation-AdjacentKSClay County115 kV100 MW3.5 yrs62.0
TAP138775Substation-AdjacentKSWashington County115 kV100 MW3.5 yrs61.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138775 substation, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.