Washington County, Kansas · SPP

DC Readiness
61.7
Good / 100

TAP138775 is a substation-adjacent datacenter candidate site in Washington County, Kansas, interconnecting through SPP. It screens at 61.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP138775
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneSPP_NORTH
Wholesale LMP$21.13/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSPP
Queue depth16
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPBeloit-NOC
IXP distance62.3 mi
Fiber providers6
Fiber coverage38.0%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance122.0 mi

Site characteristics

Parcel ownerWESTAR ENERGY INC
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)2.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index61.1 (avg 100)

Location context

Nearest datacenterBeloit-NOC
DC distance62.3 mi
Nearest rail5.7 mi
Nearest gas pipeline6.9 mi
Nearest fiber route93.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity12.95¢/kWh
Industrial electricity7.92¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,737

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
51
Fiber connectivity12%
57
Energy cost10%
90
Water risk8%
67
Natural hazard8%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
25
Land / acreage3%
51
Construction cost3%
99
Gas pipeline2%
78
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near TAP138775
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN119676Substation-Adjacent115 kV100 MW3.5 yrs63.8
CLIFTONSubstation-Adjacent115 kV100 MW3.5 yrs62.4
UNKNOWN132426Substation-Adjacent115 kV100 MW3.5 yrs61.1
EC Near WashingtonGreenfield3.5 yrs58.3
EC Near WashingtonGreenfield3.5 yrs58.1
EC Near WashingtonGreenfield3.5 yrs57.8
Greenfield (CLIFTON - TAP138775)Greenfield115 kV100 MW3.5 yrs57.4
EC Near WashingtonGreenfield3.5 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138775, Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.