TOP CROP

Substation

Illinois · COMMONWEALTH EDISON CO

Max voltage
345
kV

TOP CROP is an electric transmission substation in Illinois, operated by COMMONWEALTH EDISON CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorCOMMONWEALTH EDISON CO
Coordinates41.1425, -88.5889

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#27878345 kVCOMMONWEALTH EDISON COIN SERVICE53.6 mi
#37622345 kVCOMMONWEALTH EDISON COIN SERVICE0.1 mi
#45436345 kVIN SERVICE73.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TOP CROP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TOP CROP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP138227Substation-AdjacentILKendall County345 kV600 MW4.6 yrs74.4
TAP138230Substation-AdjacentILKendall County345 kV600 MW4.6 yrs74.3
DRESDEN STATIONSubstation-AdjacentILGrundy County345 kV600 MW2.2 yrs71.5
PLANO (345 KV)Substation-AdjacentILKendall County345 kV600 MW4.6 yrs71.3
PONTIAC MIDPOINTSubstation-AdjacentILLivingston County345 kV600 MW4.6 yrs70.9
COLLINSSubstation-AdjacentILGrundy County765 kV1,000 MW4.6 yrs69.5
Greenfield (COLLINS - PLANO (765 KV))GreenfieldILKendall County765 kV1,000 MW4.6 yrs68.9
Greenfield (COLLINS - PLANO (765 KV))GreenfieldILKendall County765 kV1,000 MW4.6 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TOP CROP substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.