TAP153754

Substation

Illinois · AMEREN ILLINOIS COMPANY

Max voltage
161
kV

TAP153754 is an electric transmission substation in Illinois, operated by AMEREN ILLINOIS COMPANY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAMEREN ILLINOIS COMPANY
Co-ownerGRIDLIANCE
Coordinates37.1766, -88.8432

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18765161 kVAMEREN ILLINOIS COMPANYIN SERVICE0.4 mi
#28808161 kVAMEREN ILLINOIS COMPANYIN SERVICE0.4 mi
#65540161 kVGRIDLIANCEIN SERVICE9.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153754, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153754 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SHAWNEESubstation-AdjacentILMassac County500 kV1,000 MW4.6 yrs81.3
JOPPA 345Substation-AdjacentILMassac County345 kV600 MW4.6 yrs75.6
JOPPASubstation-AdjacentILJohnson County230 kV300 MW4.6 yrs70.7
UNKNOWN121869Substation-AdjacentILMassac County161 kV100 MW4.6 yrs70.4
UNKNOWN155637Substation-AdjacentKYMcCracken County161 kV100 MW4.6 yrs70.2
UNKNOWN122861Substation-AdjacentKYMcCracken County161 kV100 MW4.6 yrs69.7
UNKNOWN122850Substation-AdjacentKYMcCracken County161 kV100 MW4.6 yrs69.5
UNKNOWN122852Substation-AdjacentKYMcCracken County161 kV100 MW4.6 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153754 substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.