TAP139406

Substation

Illinois · AMEREN ILLINOIS COMPANY

Max voltage
138
kV

TAP139406 is an electric transmission substation in Illinois, operated by AMEREN ILLINOIS COMPANY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAMEREN ILLINOIS COMPANY
Coordinates39.6998, -89.0234

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18781138 kVAMEREN ILLINOIS COMPANYIN SERVICE3.4 mi
#27165138 kVAMEREN ILLINOIS COMPANYIN SERVICE17.2 mi
#49853138 kVAMEREN ILLINOIS COMPANYIN SERVICE13.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139406, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139406 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GOOSE CREEKSubstation-AdjacentILPiatt County345 kV600 MW4.6 yrs70.8
TAP138277Substation-AdjacentILPiatt County345 kV600 MW4.6 yrs70.6
FARADAYSubstation-AdjacentILMacon County345 kV600 MW4.6 yrs70.0
PANASubstation-AdjacentILChristian County345 kV600 MW4.6 yrs69.8
KINCAID STATIONSubstation-AdjacentILChristian County345 kV600 MW4.6 yrs69.4
TAP170250Substation-AdjacentILDe Witt County345 kV600 MW4.6 yrs68.6
TAP138261Substation-AdjacentILMacon County345 kV600 MW4.6 yrs68.4
OREANASubstation-AdjacentILMacon County345 kV600 MW4.6 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.