TAP138288

Substation

Illinois · NORTHERN INDIANA PUB SERV CO

Max voltage
345
kV

TAP138288 is an electric transmission substation in Illinois, operated by NORTHERN INDIANA PUB SERV CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN INDIANA PUB SERV CO
Coordinates40.5846, -87.2859

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20352345 kVNORTHERN INDIANA PUB SERV COIN SERVICE0.1 mi
#29288345 kVNORTHERN INDIANA PUB SERV COIN SERVICE2.8 mi
#31421345 kVNORTHERN INDIANA PUB SERV COIN SERVICE4.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138288, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138288 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEQUINESubstation-AdjacentINTippecanoe County345 kV600 MW3.0 yrs73.3
UNKNOWN123283Substation-AdjacentINWhite County345 kV600 MW3.0 yrs71.9
MEADOW LAKE WIND FARM II LLCSubstation-AdjacentINWhite County345 kV600 MW3.0 yrs71.8
UNKNOWN123368Substation-AdjacentINTippecanoe County345 kV600 MW3.0 yrs71.1
MEADOW LAKESubstation-AdjacentINWhite County345 kV600 MW3.0 yrs70.8
UNKNOWN123974Substation-AdjacentINBenton County345 kV600 MW4.6 yrs70.7
UNKNOWN123978Substation-AdjacentINBenton County345 kV600 MW4.6 yrs70.6
TAP138288Substation-AdjacentINBenton County345 kV600 MW4.6 yrs70.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138288 substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.