TAP138188

Substation

Illinois · NORTHERN INDIANA PUB SERV CO

Max voltage
138
kV

TAP138188 is an electric transmission substation in Illinois, operated by NORTHERN INDIANA PUB SERV CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN INDIANA PUB SERV CO
Coordinates41.6144, -87.1630

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6648138 kVNORTHERN INDIANA PUB SERV COIN SERVICE0.2 mi
#12268138 kVNORTHERN INDIANA PUB SERV COIN SERVICE1.5 mi
#15171138 kVNORTHERN INDIANA PUB SERV COIN SERVICE3.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138188, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138188 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SHEFFIELDSubstation-AdjacentINLake County345 kV600 MW2.2 yrs76.9
BURNHAMSubstation-AdjacentILCook County345 kV600 MW2.2 yrs75.8
SHEFFIELDSubstation-AdjacentINLake County345 kV600 MW4.6 yrs75.4
UNKNOWN122285Substation-AdjacentILCook County345 kV600 MW2.2 yrs75.2
UNKNOWN122531Substation-AdjacentILCook County345 kV600 MW2.2 yrs75.0
UNKNOWN122743Substation-AdjacentINLake County345 kV600 MW4.6 yrs74.4
MUNSTERSubstation-AdjacentINLake County345 kV600 MW4.6 yrs74.3
TOWER ROADSubstation-AdjacentINPorter County345 kV600 MW4.6 yrs73.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138188 substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.