TAP138150

Substation

Illinois · COMMONWEALTH EDISON CO

Max voltage
345
kV

TAP138150 is an electric transmission substation in Illinois, operated by COMMONWEALTH EDISON CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorCOMMONWEALTH EDISON CO
Coordinates41.4510, -87.5912

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14896345 kV0.3 mi
#14897345 kVCOMMONWEALTH EDISON COIN SERVICE4.9 mi
#49685345 kVCOMMONWEALTH EDISON COIN SERVICE32.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138150, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138150 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN124436Substation-AdjacentILCook County345 kV600 MW2.2 yrs78.0
SHEFFIELDSubstation-AdjacentINLake County345 kV600 MW2.2 yrs76.9
UNKNOWN122269Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.8
TAP160103Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.6
UNKNOWN122289Substation-AdjacentILDuPage County345 kV600 MW2.2 yrs76.1
BLUE ISLANDSubstation-AdjacentINLake County345 kV600 MW4.6 yrs75.9
BURNHAMSubstation-AdjacentILCook County345 kV600 MW2.2 yrs75.8
CrawfordBrownfieldILCook805 MW75.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138150 substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.