TAP138142
SubstationIllinois · COMMONWEALTH EDISON CO
TAP138142 is an electric transmission substation in Illinois, operated by COMMONWEALTH EDISON CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #7095 | 138 kV | — | IN SERVICE | 3.6 mi |
| #26648 | 138 kV | — | IN SERVICE | 0.2 mi |
| #32738 | 138 kV | COMMONWEALTH EDISON CO | IN SERVICE | 4.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP138142, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN124436 | Substation-Adjacent | IL | Cook County | 345 kV | 600 MW | 2.2 yrs | 78.0 |
| SHEFFIELD | Substation-Adjacent | IN | Lake County | 345 kV | 600 MW | 2.2 yrs | 76.9 |
| UNKNOWN122269 | Substation-Adjacent | IL | Cook County | 345 kV | 600 MW | 2.2 yrs | 76.8 |
| TAP160103 | Substation-Adjacent | IL | Cook County | 345 kV | 600 MW | 2.2 yrs | 76.6 |
| UNKNOWN122289 | Substation-Adjacent | IL | DuPage County | 345 kV | 600 MW | 2.2 yrs | 76.1 |
| UNKNOWN122246 | Substation-Adjacent | IL | DuPage County | 345 kV | 600 MW | 2.2 yrs | 76.1 |
| JOLIET 29 | Substation-Adjacent | IL | Will County | 345 kV | 600 MW | 4.6 yrs | 76.0 |
| BLUE ISLAND | Substation-Adjacent | IN | Lake County | 345 kV | 600 MW | 4.6 yrs | 75.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP138142 substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.