TAP138125

Substation

Illinois · NORTHERN INDIANA PUB SERV CO

Max voltage
138
kV

TAP138125 is an electric transmission substation in Illinois, operated by NORTHERN INDIANA PUB SERV CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN INDIANA PUB SERV CO
Coordinates41.6814, -87.5211

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14920138 kVNORTHERN INDIANA PUB SERV COIN SERVICE1.9 mi
#14921138 kVNORTHERN INDIANA PUB SERV COIN SERVICE1.9 mi
#14938138 kVNORTHERN INDIANA PUB SERV COIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138125, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138125 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN124436Substation-AdjacentILCook County345 kV600 MW2.2 yrs78.0
SHEFFIELDSubstation-AdjacentINLake County345 kV600 MW2.2 yrs76.9
UNKNOWN122269Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.8
TAP160103Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.6
ELMHURSTSubstation-AdjacentILDuPage County345 kV600 MW2.2 yrs76.2
UNKNOWN122289Substation-AdjacentILDuPage County345 kV600 MW2.2 yrs76.1
BLUE ISLANDSubstation-AdjacentINLake County345 kV600 MW4.6 yrs75.9
BURNHAMSubstation-AdjacentILCook County345 kV600 MW2.2 yrs75.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138125 substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.