MUDDY

Substation

Illinois · AMEREN ILLINOIS COMPANY

Max voltage
138
kV

MUDDY is an electric transmission substation in Illinois, operated by AMEREN ILLINOIS COMPANY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAMEREN ILLINOIS COMPANY
Coordinates37.7662, -88.5236

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#12156138 kVAMEREN ILLINOIS COMPANYIN SERVICE20.2 mi
#22662138 kVAMEREN ILLINOIS COMPANYIN SERVICE7.1 mi
#41518138 kVAMEREN ILLINOIS COMPANYIN SERVICE23.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MUDDY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MUDDY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JOPPASubstation-AdjacentILJohnson County230 kV300 MW4.6 yrs70.7
NORRIS CITY NORTHSubstation-AdjacentILWhite County345 kV600 MW4.6 yrs68.6
Greenfield (SHAWNEE - WEST FRANKFORT EAST)GreenfieldILJohnson County345 kV600 MW4.6 yrs67.3
UNKNOWN160199Substation-AdjacentILSaline County161 kV100 MW4.6 yrs66.9
UNKNOWN121874Substation-AdjacentILHamilton County138 kV100 MW4.6 yrs66.7
MARION NSubstation-AdjacentILWilliamson County138 kV100 MW4.6 yrs66.1
HERRINSubstation-AdjacentILWilliamson County138 kV100 MW4.6 yrs66.0
Greenfield (WEST FRANKFORT EAST - NORRIS C)GreenfieldILFranklin County345 kV600 MW4.6 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MUDDY substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.