LANESVILLE
SubstationIllinois
LANESVILLE is an electric transmission substation in Illinois. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #21897 | 345 kV | — | IN SERVICE | 20.0 mi |
| #44772 | 345 kV | — | IN SERVICE | 47.8 mi |
| #25595 | 138 kV | — | IN SERVICE | 11.2 mi |
| #55131 | 138 kV | — | IN SERVICE | 2.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of LANESVILLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| KINCAID STATION | Substation-Adjacent | IL | Christian County | 345 kV | 600 MW | 4.6 yrs | 69.4 |
| TAP170250 | Substation-Adjacent | IL | De Witt County | 345 kV | 600 MW | 4.6 yrs | 68.6 |
| TAP138261 | Substation-Adjacent | IL | Macon County | 345 kV | 600 MW | 4.6 yrs | 68.4 |
| OREANA | Substation-Adjacent | IL | Macon County | 345 kV | 600 MW | 4.6 yrs | 68.3 |
| Greenfield (PANA - FARADAY) | Greenfield | IL | Christian County | 345 kV | 600 MW | 4.6 yrs | 67.4 |
| TAP138265 | Substation-Adjacent | IL | Logan County | 138 kV | 100 MW | 4.6 yrs | 66.8 |
| TAP138266 | Substation-Adjacent | IL | Logan County | 138 kV | 100 MW | 4.6 yrs | 66.7 |
| Lakeside | Brownfield | IL | Sangamon | — | 75 MW | — | 66.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for LANESVILLE substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.