HEAT RECOVERY COKE FACILITY

Substation

Illinois · NORTHERN INDIANA PUB SERV CO

Max voltage
138
kV

HEAT RECOVERY COKE FACILITY is an electric transmission substation in Illinois, operated by NORTHERN INDIANA PUB SERV CO. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorNORTHERN INDIANA PUB SERV CO
Coordinates41.6788, -87.4172

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#155138 kVNORTHERN INDIANA PUB SERV COIN SERVICE0.4 mi
#27672138 kVNORTHERN INDIANA PUB SERV COIN SERVICE0.0 mi
#49335138 kVNORTHERN INDIANA PUB SERV COIN SERVICE0.4 mi
#65198138 kVNORTHERN INDIANA PUB SERV CO0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HEAT RECOVERY COKE FACILITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HEAT RECOVERY COKE FACILITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN124436Substation-AdjacentILCook County345 kV600 MW2.2 yrs78.0
SHEFFIELDSubstation-AdjacentINLake County345 kV600 MW2.2 yrs76.9
UNKNOWN122269Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.8
TAP160103Substation-AdjacentILCook County345 kV600 MW2.2 yrs76.6
BLUE ISLANDSubstation-AdjacentINLake County345 kV600 MW4.6 yrs75.9
BURNHAMSubstation-AdjacentILCook County345 kV600 MW2.2 yrs75.8
CrawfordBrownfieldILCook805 MW75.6
SHEFFIELDSubstation-AdjacentINLake County345 kV600 MW4.6 yrs75.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HEAT RECOVERY COKE FACILITY substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.