FOGARTY

Substation

Illinois

Max voltage
138
kV

FOGARTY is an electric transmission substation in Illinois. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates40.0778, -89.3318

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#55682138 kVIN SERVICE19.6 mi
#56018138 kVIN SERVICE15.7 mi
#56019138 kVIN SERVICE5.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FOGARTY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FOGARTY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP138261Substation-AdjacentILMacon County345 kV600 MW4.6 yrs68.4
SOUTH BLOOMINGTONSubstation-AdjacentILMcLean County345 kV600 MW4.6 yrs67.6
TAP138265Substation-AdjacentILLogan County138 kV100 MW4.6 yrs66.8
TAP138266Substation-AdjacentILLogan County138 kV100 MW4.6 yrs66.7
LakesideBrownfieldILSangamon75 MW66.3
HOMESTEAD WIND LLCSubstation-AdjacentILTazewell County138 kV100 MW4.6 yrs66.2
UNKNOWN123103Substation-AdjacentILLogan County138 kV100 MW4.6 yrs66.2
UNKNOWN123124Substation-AdjacentILMcLean County138 kV100 MW4.6 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.