BABCOCK

Substation

Illinois · NORTHERN INDIANA PUB SERV CO

Max voltage
345
kV

BABCOCK is an electric transmission substation in Illinois, operated by NORTHERN INDIANA PUB SERV CO. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines6

Ownership & operation

OperatorNORTHERN INDIANA PUB SERV CO
Coordinates41.5181, -87.0204

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1342345 kVNORTHERN INDIANA PUB SERV COIN SERVICE4.3 mi
#33784345 kVNORTHERN INDIANA PUB SERV COIN SERVICE28.9 mi
#38559345 kVNORTHERN INDIANA PUB SERV COIN SERVICE7.8 mi
#49214345 kVNORTHERN INDIANA PUB SERV COIN SERVICE11.8 mi
#14987138 kVNORTHERN INDIANA PUB SERV COIN SERVICE4.4 mi
#33832138 kVNORTHERN INDIANA PUB SERV COIN SERVICE7.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BABCOCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BABCOCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TOWER ROADSubstation-AdjacentINPorter County345 kV600 MW4.6 yrs73.6
WILTONSubstation-AdjacentINPorter County765 kV1,000 MW4.6 yrs73.2
MICHIGAN CITYSubstation-AdjacentMIBerrien County345 kV600 MW2.2 yrs72.9
UNKNOWN122738Substation-AdjacentINLake County345 kV600 MW2.2 yrs72.7
DUNE ACRESSubstation-AdjacentINPorter County345 kV600 MW4.6 yrs72.6
UNKNOWN122721Substation-AdjacentINPorter County138 kV100 MW4.6 yrs71.3
DUNE ACRESSubstation-AdjacentINPorter County345 kV600 MW2.2 yrs71.1
UNKNOWN122738Substation-AdjacentINLake County345 kV600 MW4.6 yrs71.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BABCOCK substation, Illinois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.