OROFINO

Substation

Idaho · CLEARWATER POWER COMPANY

Max voltage
138
kV

OROFINO is an electric transmission substation in Idaho, operated by CLEARWATER POWER COMPANY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage115 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCLEARWATER POWER COMPANY
StateIdaho
Coordinates46.4907, -116.2495

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70602138 kVCLEARWATER POWER COMPANY3.6 mi
#70603138 kVCLEARWATER POWER COMPANY24.1 mi
#70668115 kVCLEARWATER POWER COMPANY17.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of OROFINO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near OROFINO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DWORSHAKSubstation-AdjacentIDLewis County500 kV1,000 MW1.1 yrs72.8
DWORSHAKSubstation-AdjacentIDLewis County500 kV1,000 MW2.0 yrs72.2
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs70.0
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs70.0
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs68.7
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs67.6
Greenfield (HATWAI - DWORSHAK)GreenfieldIDLewis County500 kV1,000 MW2.0 yrs63.0
DWORSHAK NO.2Substation-AdjacentIDLewis County138 kV100 MW2.0 yrs61.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.