Lewis County, Idaho · WECC

DC Readiness
72.2
Excellent / 100

DWORSHAK is a substation-adjacent datacenter candidate site in Lewis County, Idaho, interconnecting through WECC. It screens at 72.2/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 2.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationDWORSHAK
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait2.0 yrs
Recent queue wait1.9 yrs
Completion rate30%
Withdrawal rate70%

Connectivity

Nearest IXPCRALIDXX - Coeur d'Alene Central Office
IXP distance84.0 mi
Fiber providers1
Fiber coverage0.1%
Nearest cloud providerAzure
Nearest cloud regionwestus2
Cloud region distance173.3 mi

Site characteristics

Parcel ownerBennett Lumber Products, Inc
Parcel APNRP37N01E284800
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index58.9 (avg 100)

Location context

Nearest datacenterNeutron - Coeur d'Alene
DC distance84.3 mi
Nearest rail1.4 mi
Nearest gas pipeline12.3 mi
Nearest fiber route105.2 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.02¢/kWh
Industrial electricity5.55¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$2,819

Incentive detail: Personal property tax exemption on computer equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power15%
42
Fiber connectivity12%
48
Energy cost10%
100
Water risk8%
64
Natural hazard8%
85
Buildability7%
80
Labor market4%
50
DC cluster4%
25
Land / acreage3%
51
Construction cost3%
100
Gas pipeline2%
60
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Lewis County, ranked by DC Readiness.

Sites near DWORSHAK
SiteTypeVoltageCapacityQueue waitScore
DWORSHAKSubstation-Adjacent500 kV1,000 MW1.1 yrs72.8
Greenfield (HATWAI - DWORSHAK)Greenfield500 kV1,000 MW2.0 yrs63.0
DWORSHAK NO.2Substation-Adjacent138 kV100 MW2.0 yrs61.2
TAP204919Substation-Adjacent138 kV100 MW2.0 yrs61.1
UNKNOWN204930Substation-Adjacent115 kV100 MW2.0 yrs60.8
OROFINOSubstation-Adjacent138 kV100 MW2.0 yrs58.8
Greenfield (LOLO - HUNTER CREEK)Greenfield230 kV300 MW1.7 yrs57.7
Greenfield (UNKNOWN204930 - OROFINO)Greenfield115 kV100 MW2.0 yrs56.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DWORSHAK, Lewis County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.