DWORSHAK NO.2

Substation

Idaho · CLEARWATER POWER COMPANY

Max voltage
138
kV

DWORSHAK NO.2 is an electric transmission substation in Idaho, operated by CLEARWATER POWER COMPANY. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorCLEARWATER POWER COMPANY
StateIdaho
Coordinates46.5044, -116.3227

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70615138 kVCLEARWATER POWER COMPANY0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DWORSHAK NO.2, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DWORSHAK NO.2 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DWORSHAKSubstation-AdjacentIDLewis County500 kV1,000 MW1.1 yrs72.8
DWORSHAKSubstation-AdjacentIDLewis County500 kV1,000 MW2.0 yrs72.2
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs70.0
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs70.0
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs68.7
Greenfield (HATWAI - DWORSHAK)GreenfieldIDNez Perce County500 kV1,000 MW2.0 yrs68.0
Greenfield (DWORSHAK - TAFT)GreenfieldIDLatah County500 kV1,000 MW1.1 yrs67.6
JULIAETTASubstation-AdjacentIDNez Perce County138 kV100 MW2.0 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DWORSHAK NO.2 substation, Idaho. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.