TAP174811

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP174811 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates32.5604, -84.0932

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#62082115 kVGEORGIA POWER CO1.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP174811, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP174811 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN157034Substation-AdjacentGATaylor County230 kV300 MW5.8 yrs73.5
UNKNOWN113414Substation-AdjacentGATaylor County230 kV300 MW5.8 yrs73.0
TAP143064Substation-AdjacentGAUpson County230 kV300 MW5.8 yrs72.1
Greenfield (UNKNOWN115783 - BONAIRE)GreenfieldGABibb County500 kV1,000 MW5.8 yrs70.5
UNKNOWN113560Substation-AdjacentGAPeach County230 kV300 MW5.8 yrs69.7
UNKNOWN112027Substation-AdjacentGASchley County230 kV300 MW5.8 yrs69.5
UNKNOWN115230Substation-AdjacentGABibb County115 kV100 MW5.8 yrs68.8
Greenfield (UNKNOWN115783 - BONAIRE)GreenfieldGAPeach County500 kV1,000 MW5.8 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP174811 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.