TAP169126

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP169126 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates31.3512, -83.1121

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#52152115 kVGEORGIA POWER COIN SERVICE10.4 mi
#55639115 kVGEORGIA POWER COIN SERVICE8.4 mi
#55646115 kVGEORGIA POWER COIN SERVICE2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169126, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169126 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN111864 - NORTH TIFTON)GreenfieldGAIrwin County500 kV1,000 MW5.8 yrs69.3
Greenfield (UNKNOWN111864 - NORTH TIFTON)GreenfieldGAIrwin County500 kV1,000 MW5.8 yrs69.0
STUMP CREEKSubstation-AdjacentGAIrwin County230 kV300 MW5.8 yrs68.9
Greenfield (UNKNOWN111864 - NORTH TIFTON)GreenfieldGABen Hill County500 kV1,000 MW5.8 yrs68.3
Greenfield (UNKNOWN111864 - NORTH TIFTON)GreenfieldGACoffee County500 kV1,000 MW5.8 yrs68.2
UNKNOWN111751Substation-AdjacentGAIrwin County115 kV100 MW5.8 yrs67.9
TAP142751Substation-AdjacentGACook County115 kV100 MW5.8 yrs67.7
UNKNOWN156834Substation-AdjacentGACoffee County115 kV100 MW5.8 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen