TAP160546
SubstationGeorgia · GEORGIA POWER CO
TAP160546 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #1600 | 115 kV | GEORGIA POWER CO | IN SERVICE | 3.7 mi |
| #25881 | 115 kV | GEORGIA POWER CO | IN SERVICE | 11.8 mi |
| #62084 | 115 kV | GEORGIA POWER CO | IN SERVICE | 12.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP160546, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN157034 | Substation-Adjacent | GA | Taylor County | 230 kV | 300 MW | 5.8 yrs | 73.5 |
| UNKNOWN113414 | Substation-Adjacent | GA | Taylor County | 230 kV | 300 MW | 5.8 yrs | 73.0 |
| UNKNOWN111743 | Substation-Adjacent | GA | Sumter County | 230 kV | 300 MW | 5.8 yrs | 72.1 |
| UNKNOWN113560 | Substation-Adjacent | GA | Peach County | 230 kV | 300 MW | 5.8 yrs | 69.7 |
| UNKNOWN112027 | Substation-Adjacent | GA | Schley County | 230 kV | 300 MW | 5.8 yrs | 69.5 |
| Greenfield (FORTSON - NORTH TIFTON) | Greenfield | GA | Sumter County | 500 kV | 1,000 MW | 3.7 yrs | 68.7 |
| UNKNOWN111742 | Substation-Adjacent | GA | Sumter County | 115 kV | 100 MW | 5.8 yrs | 68.3 |
| Greenfield (UNKNOWN115783 - BONAIRE) | Greenfield | GA | Peach County | 500 kV | 1,000 MW | 5.8 yrs | 68.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP160546 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.