TAP155354
SubstationGeorgia · GEORGIA POWER CO
TAP155354 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #6440 | 115 kV | GEORGIA POWER CO | IN SERVICE | 4.0 mi |
| #22510 | 115 kV | GEORGIA POWER CO | IN SERVICE | 1.8 mi |
| #25845 | 115 kV | GEORGIA POWER CO | IN SERVICE | 8.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP155354, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BIG SHANTY | Substation-Adjacent | GA | Cobb County | 500 kV | 1,000 MW | 5.8 yrs | 79.9 |
| BULL SLUICE | Substation-Adjacent | GA | Cobb County | 500 kV | 1,000 MW | 5.8 yrs | 78.1 |
| BIG SHANTY | Substation-Adjacent | GA | Bartow County | 500 kV | 1,000 MW | 3.7 yrs | 76.8 |
| UNKNOWN111524 | Substation-Adjacent | GA | Cherokee County | 230 kV | 300 MW | 5.8 yrs | 76.1 |
| TAP172425 | Substation-Adjacent | GA | Cobb County | 230 kV | 300 MW | 5.8 yrs | 75.9 |
| UNKNOWN111530 | Substation-Adjacent | GA | Fulton County | 230 kV | 300 MW | 5.8 yrs | 75.8 |
| UNKNOWN116279 | Substation-Adjacent | GA | Cobb County | 230 kV | 300 MW | 5.8 yrs | 75.7 |
| UNKNOWN116281 | Substation-Adjacent | GA | Cobb County | 230 kV | 300 MW | 5.8 yrs | 75.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP155354 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.