TAP143249

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP143249 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates30.9995, -84.6292

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#29692115 kVGEORGIA POWER COIN SERVICE1.0 mi
#33780115 kVGEORGIA POWER COIN SERVICE0.8 mi
#42033115 kVGEORGIA POWER COIN SERVICE8.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143249, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143249 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN108997Substation-AdjacentGAEarly County500 kV1,000 MW3.7 yrs73.3
UNKNOWN107666Substation-AdjacentGADecatur County230 kV300 MW3.7 yrs72.9
UNKNOWN107666Substation-AdjacentGAGrady County230 kV300 MW5.8 yrs72.0
UNKNOWN111603Substation-AdjacentGADecatur County230 kV300 MW5.8 yrs71.7
UNKNOWN111598Substation-AdjacentGAGrady County115 kV100 MW5.8 yrs70.5
Greenfield (UNKNOWN108997 - RACCOON CREEK)GreenfieldGAEarly County500 kV1,000 MW3.7 yrs69.7
UNKNOWN111599Substation-AdjacentGAGrady County115 kV100 MW5.8 yrs69.0
Greenfield (UNKNOWN108997 - RACCOON CREEK)GreenfieldGAEarly County500 kV1,000 MW3.7 yrs68.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143249 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.