TAP143212

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP143212 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates31.4623, -83.5306

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28352115 kVGEORGIA POWER COIN SERVICE1.5 mi
#40309115 kVGEORGIA POWER COIN SERVICE1.0 mi
#42416115 kVGEORGIA POWER COIN SERVICE8.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143212, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143212 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH TIFTONSubstation-AdjacentGATift County500 kV1,000 MW5.8 yrs71.3
UNKNOWN111125Substation-AdjacentGAColquitt County230 kV300 MW5.8 yrs70.1
Greenfield (UNKNOWN111864 - NORTH TIFTON)GreenfieldGAIrwin County500 kV1,000 MW5.8 yrs69.3
Greenfield (UNKNOWN111864 - NORTH TIFTON)GreenfieldGAIrwin County500 kV1,000 MW5.8 yrs69.0
STUMP CREEKSubstation-AdjacentGAIrwin County230 kV300 MW5.8 yrs68.9
Greenfield (RACCOON CREEK - NORTH TIFTON)GreenfieldGAWorth County500 kV1,000 MW5.8 yrs68.5
Greenfield (FORTSON - NORTH TIFTON)GreenfieldGATift County500 kV1,000 MW3.7 yrs68.4
UNKNOWN111746Substation-AdjacentGATurner County115 kV100 MW5.8 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143212 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.