TAP142753

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP142753 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates31.1982, -83.3226

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19651115 kVGEORGIA POWER COIN SERVICE10.2 mi
#32708115 kVGEORGIA POWER COIN SERVICE1.2 mi
#40345115 kVGEORGIA POWER COIN SERVICE3.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142753, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142753 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111584Substation-AdjacentGALowndes County230 kV300 MW5.8 yrs72.6
UNKNOWN111593Substation-AdjacentGABrooks County230 kV300 MW5.8 yrs71.3
NORTH TIFTONSubstation-AdjacentGATift County500 kV1,000 MW5.8 yrs71.3
UNKNOWN111575Substation-AdjacentGALowndes County230 kV300 MW5.8 yrs70.2
UNKNOWN111125Substation-AdjacentGAColquitt County230 kV300 MW5.8 yrs70.1
STUMP CREEKSubstation-AdjacentGAIrwin County230 kV300 MW5.8 yrs68.9
UNKNOWN111579Substation-AdjacentGALowndes County115 kV100 MW5.8 yrs68.5
Greenfield (FORTSON - NORTH TIFTON)GreenfieldGATift County500 kV1,000 MW3.7 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142753 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.