TAP142750

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP142750 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates31.1646, -82.8768

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15311115 kVGEORGIA POWER COIN SERVICE20.6 mi
#33301115 kVGEORGIA POWER COIN SERVICE10.9 mi
#42997115 kVGEORGIA POWER COIN SERVICE22.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142750, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142750 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111575Substation-AdjacentGALowndes County230 kV300 MW5.8 yrs70.2
UNKNOWN111579Substation-AdjacentGALowndes County115 kV100 MW5.8 yrs68.5
UNKNOWN111588Substation-AdjacentGALowndes County115 kV100 MW5.8 yrs68.2
UNKNOWN156834Substation-AdjacentGACoffee County115 kV100 MW5.8 yrs67.7
UNKNOWN111869Substation-AdjacentGACoffee County230 kV300 MW5.8 yrs67.6
UNKNOWN111580Substation-AdjacentGALowndes County115 kV100 MW5.8 yrs67.5
UNKNOWN156835Substation-AdjacentGACoffee County115 kV100 MW5.8 yrs67.3
UNKNOWN111882Substation-AdjacentGACoffee County115 kV100 MW5.8 yrs67.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142750 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.