TAP142593

Substation

Georgia · GEORGIA POWER CO

Max voltage
230
kV

TAP142593 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorGEORGIA POWER CO
Co-ownerGEORGIA TRANSMISSION CORP
StateGeorgia
Coordinates32.6013, -84.7571

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4461230 kVGEORGIA TRANSMISSION CORPIN SERVICE8.3 mi
#40640230 kVGEORGIA POWER COIN SERVICE1.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142593, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142593 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH TIFTONSubstation-AdjacentGAMuscogee County500 kV1,000 MW3.7 yrs80.5
H Allen Franklin Combined CycleBrownfieldGAHarris688 MW76.5
WALTON DISCOVER POWER FACILITYSubstation-AdjacentGAMuscogee County230 kV300 MW3.7 yrs75.6
UNKNOWN112026Substation-AdjacentGAMuscogee County230 kV300 MW5.8 yrs74.9
UNKNOWN113436Substation-AdjacentGAMuscogee County230 kV300 MW3.7 yrs74.7
UNKNOWN109353Substation-AdjacentALLee County230 kV300 MW3.7 yrs74.5
TALBOT COUNTY ENERGYSubstation-AdjacentGATalbot County230 kV300 MW5.8 yrs72.9
UNKNOWN113545Substation-AdjacentGAHarris County230 kV300 MW3.7 yrs72.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen