TAP142224

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP142224 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates33.2175, -84.2097

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28153115 kVGEORGIA POWER COIN SERVICE0.8 mi
#31685115 kVGEORGIA POWER COIN SERVICE0.1 mi
#32841115 kVGEORGIA POWER COIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142224, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142224 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNIONSubstation-AdjacentGAClayton County500 kV1,000 MW5.8 yrs79.9
O'HARASubstation-AdjacentGAHenry County500 kV1,000 MW5.8 yrs79.7
UNKNOWN115783Substation-AdjacentGAMonroe County500 kV1,000 MW3.7 yrs76.4
UNKNOWN116018Substation-AdjacentGAClayton County230 kV300 MW5.8 yrs75.7
UNKNOWN116244Substation-AdjacentGAClayton County230 kV300 MW5.8 yrs75.0
UNKNOWN116410Substation-AdjacentGAFayette County230 kV300 MW5.8 yrs74.8
TAP142210Substation-AdjacentGARockdale County230 kV300 MW5.8 yrs74.5
TAP142221Substation-AdjacentGAHenry County230 kV300 MW5.8 yrs74.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen