TAP142213
SubstationGeorgia · GEORGIA POWER CO
TAP142213 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #1587 | 115 kV | GEORGIA POWER CO | IN SERVICE | 6.0 mi |
| #28423 | 115 kV | GEORGIA POWER CO | IN SERVICE | 2.1 mi |
| #39852 | 115 kV | GEORGIA POWER CO | IN SERVICE | 1.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP142213, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MPC GENERATING | Substation-Adjacent | GA | Walton County | 230 kV | 300 MW | 5.8 yrs | 75.7 |
| UNKNOWN116163 | Substation-Adjacent | GA | DeKalb County | 230 kV | 300 MW | 5.8 yrs | 75.6 |
| W R Clayton Plant | Brownfield | GA | Walton | — | 513 MW | — | 75.6 |
| UNKNOWN116162 | Substation-Adjacent | GA | Gwinnett County | 230 kV | 300 MW | 5.8 yrs | 73.8 |
| UNKNOWN116131 | Substation-Adjacent | GA | Newton County | 230 kV | 300 MW | 5.8 yrs | 73.7 |
| UNKNOWN115868 | Substation-Adjacent | GA | Newton County | 230 kV | 300 MW | 5.8 yrs | 73.5 |
| UNKNOWN116032 | Substation-Adjacent | GA | Henry County | 230 kV | 300 MW | 5.8 yrs | 73.1 |
| UNKNOWN116130 | Substation-Adjacent | GA | Rockdale County | 230 kV | 300 MW | 5.8 yrs | 72.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP142213 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.