TAP142129

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

TAP142129 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates31.2740, -81.5506

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8405115 kVGEORGIA POWER COIN SERVICE0.5 mi
#22059115 kVGEORGIA POWER COIN SERVICE0.8 mi
#43038115 kVGEORGIA POWER COIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142129, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142129 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
THALMANNSubstation-AdjacentGAGlynn County500 kV1,000 MW3.7 yrs76.4
UNKNOWN111819Substation-AdjacentGAGlynn County230 kV300 MW5.8 yrs73.0
UNKNOWN111835Substation-AdjacentGAMcIntosh County115 kV100 MW5.8 yrs69.0
Greenfield (BLANDFORD - THALMANN)GreenfieldGAMcIntosh County500 kV1,000 MW3.7 yrs68.4
UNKNOWN111817Substation-AdjacentGAGlynn County230 kV300 MW5.8 yrs68.3
UNKNOWN111824Substation-AdjacentGAGlynn County115 kV100 MW5.8 yrs67.9
UNKNOWN111829Substation-AdjacentGAGlynn County115 kV100 MW5.8 yrs67.5
UNKNOWN111834Substation-AdjacentGAMcIntosh County115 kV100 MW5.8 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.