TAP142093

Substation

Georgia · GEORGIA POWER CO

Max voltage
230
kV

TAP142093 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates31.2798, -81.6744

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19015230 kVGEORGIA POWER COIN SERVICE2.1 mi
#30943230 kVGEORGIA POWER COIN SERVICE31.9 mi
#46136230 kVGEORGIA POWER COIN SERVICE6.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142093, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142093 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
THALMANNSubstation-AdjacentGAGlynn County500 kV1,000 MW3.7 yrs76.4
UNKNOWN111819Substation-AdjacentGAGlynn County230 kV300 MW5.8 yrs73.0
UNKNOWN111566Substation-AdjacentGACharlton County230 kV300 MW5.8 yrs72.5
DUVALSubstation-AdjacentGABrantley County500 kV1,000 MW5.8 yrs71.8
Greenfield (UNKNOWN111864 - DUVAL)GreenfieldGABrantley County500 kV1,000 MW5.8 yrs71.5
Greenfield (UNKNOWN111864 - DUVAL)GreenfieldGABrantley County500 kV1,000 MW5.8 yrs70.2
Greenfield (UNKNOWN111864 - DUVAL)GreenfieldGACharlton County500 kV1,000 MW5.8 yrs69.4
UNKNOWN116863Substation-AdjacentGAWayne County500 kV1,000 MW5.8 yrs69.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.