TAP142082 is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
StateGeorgia
Coordinates32.8085, -83.7466

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9153115 kVGEORGIA POWER COIN SERVICE1.9 mi
#24739115 kVGEORGIA POWER COIN SERVICE4.4 mi
#49897115 kVGEORGIA POWER COIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142082, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142082 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115783Substation-AdjacentGAMonroe County500 kV1,000 MW3.7 yrs76.4
BONAIRESubstation-AdjacentGAHouston County500 kV1,000 MW5.8 yrs76.3
UNKNOWN114837Substation-AdjacentGABibb County230 kV300 MW5.8 yrs72.6
Greenfield (UNKNOWN115783 - O'HARA)GreenfieldGAMonroe County500 kV1,000 MW5.8 yrs71.2
MID-GEORGIA COGENERATION FACILITYSubstation-AdjacentGAHouston County230 kV300 MW5.8 yrs70.7
Greenfield (UNKNOWN115783 - WARTHEN SUBSTA)GreenfieldGAJones County500 kV1,000 MW3.7 yrs70.6
Greenfield (UNKNOWN115783 - BONAIRE)GreenfieldGABibb County500 kV1,000 MW5.8 yrs70.5
UNKNOWN113537Substation-AdjacentGATwiggs County230 kV300 MW3.7 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142082 substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.