TALBOT COUNTY ENERGY

Substation

Georgia · GEORGIA TRANSMISSION CORP

Max voltage
230
kV

TALBOT COUNTY ENERGY is an electric transmission substation in Georgia, operated by GEORGIA TRANSMISSION CORP. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorGEORGIA TRANSMISSION CORP
StateGeorgia
Coordinates32.5376, -84.5786

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4461230 kVGEORGIA TRANSMISSION CORPIN SERVICE8.3 mi
#8239230 kVGEORGIA TRANSMISSION CORPIN SERVICE22.4 mi
#21238230 kVGEORGIA TRANSMISSION CORP0.1 mi
#26404230 kVGEORGIA TRANSMISSION CORPIN SERVICE20.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TALBOT COUNTY ENERGY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TALBOT COUNTY ENERGY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH TIFTONSubstation-AdjacentGAMuscogee County500 kV1,000 MW3.7 yrs80.5
UNKNOWN112026Substation-AdjacentGAMuscogee County230 kV300 MW5.8 yrs74.9
UNKNOWN113436Substation-AdjacentGAMuscogee County230 kV300 MW3.7 yrs74.7
UNKNOWN157034Substation-AdjacentGATaylor County230 kV300 MW5.8 yrs73.5
UNKNOWN113414Substation-AdjacentGATaylor County230 kV300 MW5.8 yrs73.0
TALBOT COUNTY ENERGYSubstation-AdjacentGATalbot County230 kV300 MW5.8 yrs72.9
UNKNOWN157030Substation-AdjacentGAMuscogee County115 kV100 MW5.8 yrs72.1
UNKNOWN113546Substation-AdjacentGAHarris County230 kV300 MW3.7 yrs72.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TALBOT COUNTY ENERGY substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.