SWIFT CREEK

Substation

Georgia · DUKE ENERGY FLORIDA, LLC

Max voltage
115
kV

SWIFT CREEK is an electric transmission substation in Georgia, operated by DUKE ENERGY FLORIDA, LLC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateGeorgia
Coordinates30.4166, -82.9703

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6243115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE7.6 mi
#36335115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE8.1 mi
#48787115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE25.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SWIFT CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SWIFT CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FORT WHITESubstation-AdjacentFLSuwannee County230 kV300 MW5.8 yrs70.0
UNKNOWN120444Substation-AdjacentFLHamilton County230 kV300 MW5.8 yrs69.3
UNKNOWN107674Substation-AdjacentFLSuwannee County230 kV300 MW5.8 yrs68.8
UNKNOWN107689Substation-AdjacentGALowndes County115 kV100 MW5.8 yrs68.6
UNKNOWN108267Substation-AdjacentFLColumbia County115 kV100 MW3.6 yrs68.5
Suwannee RiverBrownfieldFLSuwannee147 MW68.3
UNKNOWN111588Substation-AdjacentGALowndes County115 kV100 MW5.8 yrs68.2
RAVENSubstation-AdjacentFLColumbia County230 kV300 MW3.6 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.