CARTERS
SubstationGeorgia · GEORGIA POWER CO
CARTERS is an electric transmission substation in Georgia, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #521 | 230 kV | GEORGIA POWER CO | — | 0.2 mi |
| #6355 | 230 kV | GEORGIA POWER CO | IN SERVICE | 9.7 mi |
| #31472 | 230 kV | GEORGIA POWER CO | — | 0.2 mi |
| #36134 | 230 kV | GEORGIA POWER CO | — | 0.2 mi |
| #50186 | 230 kV | GEORGIA POWER CO | IN SERVICE | 0.5 mi |
| #50467 | 230 kV | GEORGIA POWER CO | — | 0.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of CARTERS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN109914 | Substation-Adjacent | GA | Whitfield County | 500 kV | 1,000 MW | 3.7 yrs | 76.0 |
| UNKNOWN110634 | Substation-Adjacent | GA | Gordon County | 500 kV | 1,000 MW | 5.8 yrs | 73.8 |
| UNKNOWN110859 | Substation-Adjacent | GA | Cherokee County | 500 kV | 1,000 MW | 5.8 yrs | 73.7 |
| CENTER POINT | Substation-Adjacent | GA | Whitfield County | 230 kV | 300 MW | 3.7 yrs | 72.8 |
| UNKNOWN110638 | Substation-Adjacent | GA | Bartow County | 230 kV | 300 MW | 3.7 yrs | 72.2 |
| UNKNOWN110634 | Substation-Adjacent | GA | Bartow County | 500 kV | 1,000 MW | 3.7 yrs | 71.9 |
| MOSS LAKE | Substation-Adjacent | GA | Gordon County | 230 kV | 300 MW | 3.7 yrs | 71.9 |
| UNKNOWN110063 | Substation-Adjacent | GA | Whitfield County | 230 kV | 300 MW | 3.7 yrs | 71.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for CARTERS substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.