TAP161525

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
115
kV

TAP161525 is an electric transmission substation in Florida, operated by FLORIDA POWER & LIGHT CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorFLORIDA POWER & LIGHT CO
StateFlorida
Coordinates30.2132, -82.3576

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#46830115 kVFLORIDA POWER & LIGHT CO20.5 mi
#46844115 kVFLORIDA POWER & LIGHT COIN SERVICE0.5 mi
#46854115 kVFLORIDA POWER & LIGHT COIN SERVICE2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP161525, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP161525 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121285Substation-AdjacentFLBaker County230 kV300 MW3.6 yrs71.3
UNKNOWN108267Substation-AdjacentFLColumbia County115 kV100 MW3.6 yrs68.5
BALDWINSubstation-AdjacentFLBaker County115 kV100 MW3.6 yrs68.1
RAVENSubstation-AdjacentFLColumbia County230 kV300 MW3.6 yrs67.7
KINGSLEY LAKESubstation-AdjacentFLClay County230 kV300 MW3.6 yrs67.4
Greenfield (DUVAL - RICE)GreenfieldFLClay County500 kV1,000 MW3.6 yrs67.4
Greenfield (DUVAL - RAVEN)GreenfieldFLColumbia County230 kV300 MW3.6 yrs66.9
UNKNOWN108268Substation-AdjacentFLColumbia County115 kV100 MW3.6 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP161525 substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.