TAP151445

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
230
kV

TAP151445 is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, LLC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates29.1318, -82.0459

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4178230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE42.4 mi
#4765230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE4.7 mi
#51085230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151445, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151445 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ARCHERSubstation-AdjacentFLAlachua County230 kV300 MW3.6 yrs71.3
HAINESSubstation-AdjacentFLLake County230 kV300 MW3.6 yrs71.2
UNKNOWN108236Substation-AdjacentFLMarion County230 kV300 MW3.6 yrs70.5
DEADEND167092Substation-AdjacentFLMarion County230 kV300 MW3.6 yrs70.0
UNKNOWN151452Substation-AdjacentFLSumter County230 kV300 MW3.6 yrs69.6
UNKNOWN120464Substation-AdjacentFLMarion County230 kV300 MW3.6 yrs69.5
Greenfield (CRYSTAL RIVER - CENTRAL FLORID)GreenfieldFLCitrus County500 kV1,000 MW3.6 yrs67.6
UNKNOWN120466Substation-AdjacentFLMarion County230 kV300 MW3.6 yrs67.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.