TAP151117 is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, LLC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.4710, -82.4839

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3713115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE3.2 mi
#5701115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE0.9 mi
#18580115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151117, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151117 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKE TARPONSubstation-AdjacentFLPasco County500 kV1,000 MW3.6 yrs79.2
BROOKRIDGESubstation-AdjacentFLHernando County500 kV1,000 MW3.6 yrs75.5
ANCLOTESubstation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
DALE MABRYSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs73.0
TAP143447Substation-AdjacentFLPasco County230 kV300 MW3.6 yrs73.0
HUDSONSubstation-AdjacentFLPasco County230 kV300 MW3.6 yrs72.8
BROOKSVILLE WESTSubstation-AdjacentFLHernando County230 kV300 MW3.6 yrs72.7
SEVEN SPRINGSSubstation-AdjacentFLPasco County230 kV300 MW3.6 yrs72.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP151117 substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.