TAP143326

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
230
kV

TAP143326 is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, LLC. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.0603, -82.6229

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2551230 kVDUKE ENERGY FLORIDA, LLCIN SERVICE4.0 mi
#27244230 kVIN SERVICE1.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143326, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143326 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKE TARPONSubstation-AdjacentFLPasco County500 kV1,000 MW3.6 yrs79.2
DEADEND167089Substation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.6
JUNEAUSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.4
UNKNOWN120308Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
ANCLOTESubstation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
UNKNOWN120342Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.3
TAP151120Substation-AdjacentFLHillsborough County138 kV100 MW3.6 yrs73.1
DALE MABRYSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs73.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143326 substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.