TAP141793

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
138
kV

TAP141793 is an electric transmission substation in Florida, operated by FLORIDA POWER & LIGHT CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorFLORIDA POWER & LIGHT CO
StateFlorida
Coordinates25.0575, -80.4762

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#12893138 kVIN SERVICE0.1 mi
#27939138 kVIN SERVICE30.0 mi
#28542138 kVFLORIDA POWER & LIGHT COIN SERVICE6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP141793, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP141793 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Turkey PointBrownfieldFLMiami-Dade County818 MW3.6 yrs66.1
UNKNOWN120102Substation-AdjacentFLMiami-Dade County230 kV300 MW3.6 yrs62.4
JEWFISH CREEKSubstation-AdjacentFLMiami-Dade County138 kV100 MW3.6 yrs62.1
TAP141793Substation-AdjacentFLMiami-Dade County138 kV100 MW3.6 yrs60.4
ISLAMORADASubstation-AdjacentFLMiami-Dade County138 kV100 MW3.6 yrs59.2
EC Near G W IveyGreenfieldFLMiami Dade3.6 yrs57.9
Greenfield (UNKNOWN120081 - UNKNOWN120102)GreenfieldFLMiami-Dade County138 kV100 MW3.6 yrs57.1
Greenfield (TAP141793 - FLORIDA CITY)GreenfieldFLMiami-Dade County138 kV100 MW3.6 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP141793 substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.