PASCO CNTY SOLID WASTE RESOURCE RECOVERY

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
115
kV

PASCO CNTY SOLID WASTE RESOURCE RECOVERY is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, LLC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.3697, -82.5603

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1662115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE0.6 mi
#25282115 kVDUKE ENERGY FLORIDA, LLC0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PASCO CNTY SOLID WASTE RESOURCE RECOVERY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PASCO CNTY SOLID WASTE RESOURCE RECOVERY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKE TARPONSubstation-AdjacentFLPasco County500 kV1,000 MW3.6 yrs79.2
JUNEAUSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs76.4
BROOKRIDGESubstation-AdjacentFLHernando County500 kV1,000 MW3.6 yrs75.5
ANCLOTESubstation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
UNKNOWN120308Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.9
UNKNOWN120342Substation-AdjacentFLPinellas County230 kV300 MW3.6 yrs73.3
TAP151120Substation-AdjacentFLHillsborough County138 kV100 MW3.6 yrs73.1
DALE MABRYSubstation-AdjacentFLHillsborough County230 kV300 MW3.6 yrs73.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PASCO CNTY SOLID WASTE RESOURCE RECOVERY substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.