ORANGE CITY

Substation

Florida · DUKE ENERGY FLORIDA, LLC

Max voltage
115
kV

ORANGE CITY is an electric transmission substation in Florida, operated by DUKE ENERGY FLORIDA, LLC. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorDUKE ENERGY FLORIDA, LLC
StateFlorida
Coordinates28.9363, -81.2905

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9618115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE6.6 mi
#18033115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE4.7 mi
#28740115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE10.4 mi
#36682115 kVDUKE ENERGY FLORIDA, LLCIN SERVICE4.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ORANGE CITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ORANGE CITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN120236Substation-AdjacentFLOrange County230 kV300 MW3.6 yrs75.9
UNKNOWN120234Substation-AdjacentFLOrange County230 kV300 MW3.6 yrs75.1
UNKNOWN120263Substation-AdjacentFLSeminole County230 kV300 MW3.6 yrs74.6
PINE HILLSSubstation-AdjacentFLOrange County230 kV300 MW3.6 yrs74.1
UNKNOWN120247Substation-AdjacentFLSeminole County230 kV300 MW3.6 yrs73.6
UNKNOWN108681Substation-AdjacentFLSeminole County230 kV300 MW3.6 yrs73.6
UNKNOWN120219Substation-AdjacentFLLake County230 kV300 MW3.6 yrs73.5
ALTAMONTE SPRINGSSubstation-AdjacentFLOrange County230 kV300 MW3.6 yrs73.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ORANGE CITY substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.